鉴于10月份开放注册,并随有发种考核,现做如下变动:
在考核期内,各项条件仅发种未完成,将顺延1星期;
在考核期内,如多项未完成,考核期结束即封禁。

Considering the October Open Registration Assessment has torrent uploading included, the following changes will be made:
During the assessment period, if everything is passed except torrent uploading, your assessment will be extended by 1 week;
During the assessment period, if requirements other than torrent uploading are not met, you will be disabled after the end of the assessment period.